Toll Gate Greenway in Huntsville, Alabama

Toll Gate Greenway in Huntsville is an asphalted bike path. It runs in a northeast-southwest direction starting from Mountain Wood Drive Southeast and crosses Fearn Street Southeast and ends at Bankhead Parkway Northeast.

Road Type
bike path
Bicycle
designated
Route
northeast-southwest

Places of worship

  • Monte Sano Baptist Church (baptist) – approx. 0.6 mi.
  • Monte Sano United Methodist Church (united_methodist) – approx. 0.6 mi.
  • Oak Park Baptist Church (baptist) – approx. 0.9 mi.

Bicycle parking

  • Picture (20 parking spaces) – approx. 0.8 mi.
  • Cycleway (20 parking spaces) – approx. 1.1 mi.

Parking lots

  • Loading Dock – approx. 1.2 mi.

Gift shops

  • The Little Green Store – approx. 0.7 mi.

Door stores

  • Side Door – approx. 1.1 mi.