Greenwood Substation in Greenwood, MO 64034
Greenwood Substation in Greenwood, MO 64034 (Jackson County) is a substation (Evergy, 161000 V). Greenwood Substation is located near Timber Lake Trail.
- Operator
- Evergy
Streets nearby
Timber Lake Trail0.4 mi
East 137th Street0.6 mi
Greenridge Road0.7 mi
Timber Lake Drive0.7 mi
Browning Road0.8 mi
Haines Road0.8 mi
South Harris Road0.8 mi
South Pebblebrook Lane0.9 mi
Bob White Lane1.1 mi
East Outer Belt Road1.1 mi
Smart RoadWoodland School
1.1 mi
Harris Road1.1 mi
Woodland Circle1.2 mi
Shawnee Trace Nature TrailShawnee Trace Nature Trail
1.2 mi
Shawnee Trace Nature Trail - Red1.2 mi
Southeast Howard Road1.4 mi
East 130th Terrace1.4 mi
Poindexter Road1.4 mi
Madeline Court1.4 mi
Angus Drive1.5 mi
East 130th Street1.5 mi
Aimee Lane1.5 mi
Woodland Loop1.5 mi
Woodland Court1.5 mi
Woodland Road1.6 mi
Oakhaven Drive1.6 mi
Pratt Road1.6 mi
Meadowlark Street1.6 mi
Prairie View Road1.7 mi
Old Hickory Road1.7 mi
Quail Ridge Road1.7 mi
Lake Shore Drive1.7 mi
Twisted Oak Road1.7 mi
Twisted Oak Court1.7 mi
Blood, Sweat, and Ticks1.8 mi
Dams nearby
Next to Gopher Lake Dam1.2 mi
Bodarc Lake Dam1.3 mi
Gopher Lake Dam1.4 mi
Industrial areas nearby
Greenwood Energy Center550 ft
Residential areas nearby
Woodland Lake Estates1.1 mi
Trophy Estates1.4 mi
Oakhaven1.5 mi
Streams nearby
Wilson Creek1.0 mi
East Branch1.2 mi
Waters nearby
Nelly Don Lake0.6 mi
Bodarc Lake1.3 mi
Pool 101.4 mi
Gopher Lake1.4 mi
Other nearby
Harris Road Substation1.7 mi
| Railway | |
| Bus | |
| Streetcar |
| Bike path | |
| Bike lane on roadway | |
| Cycling allowed on bus lane | |
| Bicycle street | |
| Open to cyclists | |
| Open to cyclists, good path | |
| Cycling prohibited | |
| Cobblestone |
| Long-distance bike route | (depending on scale) | |
| Long-distance bike route |
| Path |
| Long-distance hiking trail | (depending on scale) | |
| Long-distance hiking trail | ||
| Pedestrians prohibited |