Stabling Road 3 in Nar Nar Goon
Stabling Road 3 in City of Frankston is a railway line (1600 mm, overhead line).
Roads nearby
Princes Freeway600 m
Oakview Lane1,0 km
Bright Avenue1,2 km
Scout Way1,2 km
Hovea Street1,2 km
Paver Road1,2 km
Ovata Circuit1,2 km
Stirling Way1,2 km
Hammock Drive1,2 km
Stag Street1,2 km
Fulgens Street1,2 km
Hotham Parade1,2 km
Maddisons Street1,2 km
Hakea Circuit1,3 km
Echidna Street1,3 km
Faithfulls Rise1,3 km
Belladi Road1,3 km
Railways nearby
Train Wash Facility700 m
Buildings nearby
Train Maintenance Facility Shed200 m
Integrated Test Facility350 m
Constructions nearby
Kala1,3 km
Railwaies nearby
Pakenham East Train Depot450 m
Railway lines nearby
Stabling Road 850 m
Stabling road 1050 m
Bypass Road100 m
Bairnsdale Line150 m
Test Road250 m
Bio Wash Graffiti Removal Road250 m
Maintenance Road 4300 m
Wheel Lathe Road300 m
Maintenance Road 5300 m
Presentation Road300 m
Maintenance Road 3300 m
Connection Road400 m
ITF Road 1450 m
ITF Road 2450 m
Stabling Road 5550 m
Stabling Road 2550 m
Stabling Road 7550 m
Stabling Road 6550 m
Stabling Road 9550 m
Stabling Road 1550 m
Stabling Road 4600 m
Maintenance Road 2600 m
Departure Road650 m
Maintenance Road 1750 m
Arrival Road900 m
Train Wash Road1000 m
Loop Road1,0 km
| Railway | |
| Bus | |
| Tram |
| Cycle path | |
| Cycle lane on road | |
| Cycling on bus lane | |
| Bicycle street | |
| Cyclists allowed | |
| Cyclists allowed, good surface | |
| No cycling | |
| Cobblestones |
| Long-distance cycle route | (depending on scale) | |
| Long-distance cycle route |
| Path |
| Long-distance hiking trail | (depending on scale) | |
| Long-distance hiking trail | ||
| No pedestrians |