Tonkin Highway On Ramp in Ellenbrook

Tonkin Highway On Ramp in City of Swan is a proposed road and runs as a one-way street in a north-south direction. Tonkin Highway On Ramp also exists in Cullacabardee, Whiteman and Bullsbrook.

Road Type
proposed road
Speed Limit
110
Route
north-south

Bus stops

  • Banrock Drive after Purnululu Road – approx. 1,3 km.
  • Banrock Drive after Nambung Junction – approx. 1,3 km.
  • Banrock Drive after Cadogan Outlook – approx. 1,3 km.
  • Banrock Drive after Gibbney Way – approx. 1,3 km.
  • Banrock Drive after Vilama Link – approx. 1,4 km.
  • Wyara Link after Brigalow Bend – approx. 1,6 km.
  • Banrock Drive after Elmridge Parkway – approx. 1,8 km.
  • Banrock Drive before Norcia Way – approx. 1,9 km.
  • Banrock Drive after Norcia Way – approx. 1,9 km.
  • Elmridge Parkway after Jervis Drive – approx. 2,0 km.
  • Elmridge Parkway before Jervis Drive – approx. 2,0 km.
  • The Broadway before Mosele Drive – approx. 2,1 km.
  • The Broadway after Moseley Drive – approx. 2,1 km.
  • Banrock Drive before Hinxman Drive – approx. 2,2 km.
  • Farmaner Parkway before Starke Turn – approx. 2,2 km.
  • Farmaner Parkway after Starke Turn – approx. 2,3 km.
  • Banrock Drive after Catlidge Street – approx. 2,3 km.
  • Elmridge Parkway after Redstone Trail – approx. 2,3 km.
  • Elmridge Parkway before Farmaner Parkway – approx. 2,3 km.
  • Farmaner Parkway after Addingham Drive – approx. 2,3 km.
  • Farmaner Parkway before Addingham Drive – approx. 2,3 km.
  • The Broadway before Voyager Link – approx. 2,4 km.
  • The Broadway after Bordeaux Lane – approx. 2,4 km.

Stops

  • Wyara Link after Brigalow Bend – approx. 1,6 km.

Supermarkets

  • Woolworths (Woolworths Group) – approx. 2,4 km.