Jalan Ahmad Ibrahim in Liu Fang
Jalan Ahmad Ibrahim in Boon Lay is a two-lane, asphalted main road (70 km/h). It runs as a one-way street in an east-west direction starting from Corporation Road and crosses Jurong Port Road, Jalan Boon Lay, Jurong Pier Road, Bird Park Drive, Jurong Hill and Pioneer Turn and ends at Pioneer Circus. The nearest stops are Givaudan and Before Pioneer Circus. The bus lines 194, 651, 715, 716, 718 and CW6 serve this stop. Jalan Ahmad Ibrahim also exists in Tukang.
- Road Type
- main road
- Lanes
- 2
- Speed Limit
- 70
- Route
- east-west
Roads nearby
Ayer Rajah ExpresswayBoon Lay
100 m
Bird Park Drive150 m
Jurong HillLiu Fang, Bongo Burgers
250 m
Jurong Pier RoadOpposite Jalan Pesawat, After Jalan Buroh, After Jalan Pesawat, Jurong Hill, Before Jalan Buroh
350 m
Jalan Boon LayOpposite Tractor Road, Tukang, Opposite Utoc Engineering, Before Tractor Road, Utoc Engineering
400 m
Tukang Innovation Grove450 m
Jurong Pier Flyover450 m
Jalan Pesawat450 m
Main Station500 m
Tukang Innovation Drive550 m
Tractor Road550 m
Quality RoadBefore Jalan Tukang, Before Boon Lay Way
600 m
Jalan Jentera650 m
Chin Bee road750 m
Jalan TukangBefore Chia Ping Road, Before Tukang Innovation Drive, Grundfos, Opposite Grundfos, After Tukang Innovation Drive, Hup Leck Heavy Equipment
750 m
Abandoned railways nearby
Former KTM Western Jurong Spur500 m
Body of waters nearby
Riverine550 m
Flamingo Pool550 m
Saddlebill600 m
Buildings nearby
Tukang Innovation150 m
The Village150 m
South Grand Textile200 m
Royal Ramble400 m
Feathers450 m
World of Darkness450 m
Penguin Lodge450 m
Pools Amphitheatre450 m
Window on Paradise500 m
Lory Station500 m
Breeding and Research Centre500 m
Hilltop Japanese and Indonesian Restaurant500 m
Wings of Asia550 m
Jungle Jewels550 m
Grundfos550 m
Sambo Innovation Building700 m
pteris700 m
Cafés nearby
Hawk Cafe400 m
Car repair shops nearby
Workshop LTH Singapore650 m
Industrial buildings nearby
Greenpac200 m
Meiden300 m
Yang Kee400 m
Leica Instruments450 m
Caterpillar450 m
JTC MedTech Hub500 m
UTOC Engineering600 m
Parks nearby
Garden of Fame550 m
Railways under construction nearby
Jurong Region Line (JRL)700 m
Roof structures nearby
Jurong Hill Prawn Fishing & Beer Garden250 m
Viewpoint nearby
Jurong Hill Tower500 m
| Railway | |
| Bus | |
| Tram |
| Cycle path | |
| Cycle lane on road | |
| Cycling on bus lane | |
| Bicycle street | |
| Cyclists allowed | |
| Cyclists allowed, good surface | |
| No cycling | |
| Cobblestones |
| Long-distance cycle route | (depending on scale) | |
| Long-distance cycle route |
| Path |
| Long-distance hiking trail | (depending on scale) | |
| Long-distance hiking trail | ||
| No pedestrians |