Tuas Basin Close in Tuas Bay
Tuas Basin Close in Tuas is a two-lane, asphalted minor road (50 km/h). It runs in a southeast-northwest direction and crosses Tuas Road. It ends in a cul-de-sac.
- Road Type
- minor road
- Lanes
- 1
- Speed Limit
- 50
- Route
- southeast-northwest
Bus stops
Bank
Supermarkets
Stations
Roads nearby
Pionner Road400 m
Pioneer RoadTuas West Road, Tuas West Road Station Exit B, Tuas Crescent Station Exit B
450 m
Tuas RoadOpposite Ocean Tanker, After Ocean Tanker, Opposite Marinteknik, Before Marinteknik, Opposite Progress Galvanizing, Progress Galvanizing
500 m
Tuas ViaductHiap Teck Metal Co
550 m
Tuas Street600 m
Tuas Basin Lane600 m
Tuas Basin LinkChuan Hua, After Tuas Cresent, Before Tuas Amenity Centre, Opposite Grinnel, Tru-Marine
600 m
Tuas Avenue 5Rockwool, Asia Steel Welded Mesh, Chugoku Marine Paints, Mapletree Logistics, YCH Distripark, Times Printers
700 m
Tuas CrescentBefore Tuas Avenue 11, After Tuas Avenue 16, B S Development, Before Tuas Loop, Unifine Star Petrochem, Damen Shipyard, Hiap Seng Engineering Limited, Blasting Abrasives, Before Tuas Avenue 13, Chia Hock Trading Co, Asia Polyurethane, Before Tuas Avenue 20, Before Tuas Avenue 18a, Paxocean, Progress Galvanizing
700 m
Tuas Avenue 13750 m
Nature nearby
Coastline of Singapore600 m
Baies nearby
Northern Tuas Basin850 m
Buildings nearby
Lanco150 m
Unik Engineering150 m
Topsteel Solutions Asia200 m
Kim Seah Boat Builders250 m
Sin Ghee Huat300 m
Kim Hock Offshore & Marine300 m
Aik Moh300 m
Frank's International300 m
Trussco300 m
TruMarine300 m
Allinton Engineering & Trading300 m
Lita Ocean350 m
Tuas Amenity Centre400 m
Global Offshore & Marine450 m
Marine Technologies450 m
PMAX One Technologies450 m
Penguin450 m
Kowa Skymech500 m
Global One500 m
Roth Engineering500 m
Hong Hua Guan Marine & Engineering500 m
Superpet550 m
IMI Precision Engineering550 m
Seng Leong Project550 m
Sea and Land Technologies550 m
Chin Yuan Metal550 m
FlexMech600 m
Garmco600 m
Klie Rentals650 m
TTJ Design and Engineering650 m
Fabri-Tech650 m
Sparco650 m
Drains nearby
Sungei Tuas400 m
Industrial buildings nearby
Catalyst Recovery Singapore550 m
Mun Siong Engineering600 m
Subway lines nearby
East West Line400 m
Vehicle inspection centres nearby
JIC Inspection Services750 m
| Railway | |
| Bus | |
| Tram |
| Cycle path | |
| Cycle lane on road | |
| Cycling on bus lane | |
| Bicycle street | |
| Cyclists allowed | |
| Cyclists allowed, good surface | |
| No cycling | |
| Cobblestones |
| Long-distance cycle route | (depending on scale) | |
| Long-distance cycle route |
| Path |
| Long-distance hiking trail | (depending on scale) | |
| Long-distance hiking trail | ||
| No pedestrians |