Nanyang Avenue in Cleantech
Nanyang Avenue in Western Water Catchment is a two-lane, asphalted minor road (50 km/h). It crosses CleanTech View, Nanyang View, Nanyang Crescent, Nanyang Drive, Faculty Avenue, Lien Ying Chow Drive and Lorong Danau and comes from Jalan Bahar. It connects Murai, Cleantech and Bahar. The nearest stops are After Lorong Danau, Before Lorong Danau and Before Jalan Bahar. The bus line 199 stops here.
- Road Type
- minor road
- Lanes
- 2
- Speed Limit
- 50
Roads nearby
CleanTech View200 m
Lorong Danau250 m
Cleantech Loop300 m
Lorong TawasCleantech
450 m
Jalan BaharBefore Nanyang Avenue
450 m
Nanyang CrescentPioneer Hall Music Room, Pioneer Hall SCRC Room, Pioneer Hall Meeting Room, Hall 15, Opposite Hall 14, Canteen 14, Nanyang Crescent Hall, Opposite Nanyang Crescent Halls, Ribs Wings Burgers, Hall 12, opp Hall 12, Canteen 13, Carpark 7, NIE Library, Blk 55, Foodgle Food Court, opp Graduate Hall
500 m
Nanyang View650 m
Lim Chu Kang RoadAfter Track 13, After Sungei Gedong Camp, Before Chinese & Muslim Cemetery, Before Lim Chu Kang Substation No. 1, B26 Lim Chu Kang Road, Opposite Lim Chu Kang Substation No. 1, B27 Lim Chu Kang Road, After Old Choa Chu Kang Road, After Chinese & Muslim Cemetery, Before Old Choa Chu Kang Road, Opposite Lim Chu Kang Camp II, After Lamp Post 93, After Ama Keng Road, Opposite Ama Keng Road, Ama Keng, After Track 11, After Lamp Post 161, Opposite Lamp Post 160, Opposite Track 11, Opposite Lamp Post 173, Opposite Track 13, After Chinese Cemetery Path 13, After Muslim Cemetery Path 17, After Lamp Post 96
800 m
Shops nearby
Thow Kwang Pottery Jungle400 m
Buildings nearby
Lien ying chow drive200 m
Block E350 m
Maritime Enegry Testbed350 m
Learning Vision NTU500 m
Carpark500 m
Nanyang Meadows Staff Housing NTU500 m
Block 56550 m
Nanyang Grove600 m
Block 55600 m
Block 53600 m
Block 54650 m
Jalan Bahar Power Station650 m
Block 49650 m
Block 52750 m
Tamarind Hall750 m
Saraca Hall750 m
Block 50750 m
Dormitories nearby
Tanjong Hall Blk 20A450 m
Industrial buildings nearby
CleanTech Two Block B250 m
JTC Launchpad250 m
Parks nearby
Jurong Eco-Garden350 m
Railways under construction nearby
Jurong Region Line (JRL)350 m
Residential areas nearby
Graduate Hall 1450 m
Hall of Residence 11600 m
Hall of Residence 10650 m
Graduate Hall 2750 m
Residential buildings nearby
Blk 21A450 m
21B450 m
Tanjong Hall Blk 20B500 m
Blk 19A500 m
Blk 20B500 m
Blk 29550 m
Blk 19B550 m
Blk 27550 m
Blk 25550 m
Blk 23600 m
Blk 21650 m
Restaurants nearby
North Hill Food Court450 m
Streams nearby
Sungei Choa Chu Kang650 m
Other nearby
Jalan Bahar 66kV Substation700 m
| Railway | |
| Bus | |
| Tram |
| Cycle path | |
| Cycle lane on road | |
| Cycling on bus lane | |
| Bicycle street | |
| Cyclists allowed | |
| Cyclists allowed, good surface | |
| No cycling | |
| Cobblestones |
| Long-distance cycle route | (depending on scale) | |
| Long-distance cycle route |
| Path |
| Long-distance hiking trail | (depending on scale) | |
| Long-distance hiking trail | ||
| No pedestrians |