Sungei Gedong Road in Murai

Sungei Gedong Road in Western Water Catchment is a two-lane, asphalted service road (50 km/h) and runs in an east-west direction and crosses Lorong Melukut.

Road Type
minor road
Lanes
2
Speed Limit
50
Route
east-west

Bus stops

  • Sungei Gedong Camp – approx. 250 m.
  • After Track 13 – approx. 350 m.
  • Opposite Track 13 – approx. 400 m.
  • Before Lim Chu Kang Substation No. 1 – approx. 600 m.
  • Opposite Lim Chu Kang Substation No. 1 – approx. 600 m.
  • Opposite Lamp Post 173 – approx. 850 m.
  • B26 Lim Chu Kang Road – approx. 850 m.
  • After Track 11 – approx. 1,1 km.
  • Opposite Track 11 – approx. 1,1 km.
  • After Lamp Post 161 – approx. 1,6 km.
  • Opposite Lamp Post 160 – approx. 1,6 km.
  • Opposite Ama Keng Road – approx. 1,8 km.
  • After Ama Keng Road – approx. 1,8 km.
  • After Lamp Post 96 – approx. 2,2 km.
  • After Lamp Post 93 – approx. 2,3 km.
  • B27 Lim Chu Kang Road – approx. 2,7 km.
  • After Old Lim Chu Kang Road – approx. 3,8 km.
  • After Lim Chu Kang Road – approx. 3,8 km.
  • After Muslim Cemetery Path 17 – approx. 4,1 km.
  • Opposite Headquarters 5th SIB Camp I – approx. 4,2 km.
  • After Chinese Cemetery Path 13 – approx. 4,3 km.

Garden centres

  • Terrascapes LLP (opening hours: Sat–Sun 10:30–17) – approx. 4,3 km.