HS2 Phase 1 in Streethay

HS2 Phase 1 in Streethay in Lichfield is a railway under construction. HS2 Phase 1 also exists in Drayton Bassett, Hints, Swinfen and Packington, Whittington and Fradley.

Speed Limit
360

Bus stops

  • Meadow Croft – approx. 600 m.
  • Trent Valley Cottages – approx. 850 m.