Iron Producing Division Office in Gary, Indiana
Iron Producing Division Office in Gary is an office. Iron Producing Division Office is located near Route 5.
- Building Type
- office building
Streets nearby
Blast Furnace Row500 ft
Route 10.2 mi
Route 50.3 mi
Route 30.3 mi
Route 80.4 mi
Route 100.4 mi
Buildings nearby
Blast Furnace No. 80.1 mi
TMS Main Office0.5 mi
Industrial areas nearby
Gary Works Power Station0.2 mi
Industrial buildings nearby
No. 4 Open Hearth400 ft
Fabrication Shop C400 ft
Celebration Station, Offline Maint400 ft
PCI West Building450 ft
Yard Office0.1 mi
Pump House No. 10.1 mi
Hot Metal Scale0.1 mi
Q-BOP0.2 mi
Q-BOP Gas Cleaner0.2 mi
Fabrication Shop D0.2 mi
No 4 Boiler House0.2 mi
14 Blast Furnace Maintenance0.2 mi
Blast Furnace No. 60.2 mi
Blast Furnace No. 140.2 mi
Turbo Blower0.2 mi
South Blast Furnaces Metallurgy Lab0.3 mi
2 Caster Water Treatment0.3 mi
1 Caster0.3 mi
1 Caster Maintenance Managers Offices0.3 mi
Iron Beaching Facility0.3 mi
Blast Furnace No. 40.3 mi
1 BOP Shop0.3 mi
Skeleton Building0.4 mi
BOP Inside Pit Aisle0.4 mi
Stairway to BOP Operation Offices0.4 mi
South Blast Furnaces SAM's Office0.4 mi
Steel Division0.4 mi
BOP Managers Offices0.4 mi
BOP Charge Aisle0.4 mi
Cooling towers0.4 mi
South Blast Furnaces Spares0.5 mi
Main Garage0.5 mi
Gas washer0.5 mi
BOP Outside Pit Aisle0.5 mi
Refrigeration East0.6 mi
Pink Building0.6 mi
Office buildings nearby
1 Caster Offices0.3 mi
46" Slab Mill Office0.4 mi
Public restrooms nearby
Fabrication Washhouse450 ft
Steel Main Womens Washhouse0.3 mi
| Railway | |
| Bus | |
| Streetcar |
| Bike path | |
| Bike lane on roadway | |
| Cycling allowed on bus lane | |
| Bicycle street | |
| Open to cyclists | |
| Open to cyclists, good path | |
| Cycling prohibited | |
| Cobblestone |
| Long-distance bike route | (depending on scale) | |
| Long-distance bike route |
| Path |
| Long-distance hiking trail | (depending on scale) | |
| Long-distance hiking trail | ||
| Pedestrians prohibited |