Future US 212 (2026) in Benton Township, Minnesota

Future US 212 (2026) in Benton Township is an expressway (Construction site) and it runs as a one-way street in a East direction and continues as Future US 212 (2025).

Road Type
building under construction
Speed Limit
60 mph
Lanes
2
Route
east-west