Future US 212 (2025) in Benton Township, Minnesota

Future US 212 (2025) in Benton Township is an expressway connector (Construction site). It runs in a East direction and continues as County Road 57. It crosses Future US 212 (2026). Future US 212 (2025) also exists in Young America Township.

Road Type
building under construction
Speed Limit
60 mph
Lanes
2
Route
east-west