Painted Tree: Lakeside North, Phase 2 in McKinney, Texas
Painted Tree: Lakeside North, Phase 2 in McKinney is a construction site.
- Land Use
- construction site
Fast food restaurants
Parcel lockers
Tire dealers
Banks
Clinics
Restaurants
Cafes
Auto parts stores
Vape shops
Beauty salons
Hair salons
Auto repair shops
Pharmacies
Opticians
Streets nearby
Mescalbean Drive100 ft
Frederick Drive250 ft
Nogalito Way550 ft
Andesite Road550 ft
Explorer Way0.1 mi
Barbary Road0.1 mi
Cherrybark Street0.1 mi
Seminole Street0.2 mi
Tungsten Street0.2 mi
Kit Fox Road0.2 mi
Slate Street0.2 mi
Dockside Drive0.2 mi
Wanderlurst Lane0.2 mi
Attwater Street0.2 mi
Taylor-Burk Drive0.2 mi
Vermilion Street0.2 mi
Shumard Street0.2 mi
Cathedral Road0.3 mi
Tios Road0.3 mi
Outpost Path0.3 mi
Gorman Drive0.3 mi
Wilmeth Road0.3 mi
Blue Aster Drive0.3 mi
Tuckerman Road0.3 mi
Wordsworth Road0.3 mi
Launch Road0.3 mi
Knob Hill0.3 mi
Menard Road0.3 mi
Nuttall Drive0.3 mi
Cairn Road0.3 mi
Hibiscus Drive0.3 mi
Lyre Leaf Way0.4 mi
Roaming Drive0.4 mi
Andromeda Drive0.4 mi
Erwin Farms Boulevard0.4 mi
Venetian Court0.4 mi
Corot Road0.4 mi
Lacebark Lane0.4 mi
Indiangrass Court0.4 mi
Outpost Trail0.4 mi
Jute Street0.5 mi
Construction sites nearby
Painted Tree: Village South, Phase 30.4 mi
Parks nearby
The Outpost0.3 mi
Residential areas nearby
Painted Tree: Lakeside North, Phase 1450 ft
Painted Tree: Lakeside Showcase0.2 mi
Painted Tree: Village North, Phase 1B0.4 mi
Painted Tree: Village North, Phase 1A0.5 mi
Painted Tree: Village South, Phase 10.5 mi
Streams nearby
Franklin Branch0.3 mi
| Railway | |
| Bus | |
| Streetcar |
| Bike path | |
| Bike lane on roadway | |
| Cycling allowed on bus lane | |
| Bicycle street | |
| Open to cyclists | |
| Open to cyclists, good path | |
| Cycling prohibited | |
| Cobblestone |
| Long-distance bike route | (depending on scale) | |
| Long-distance bike route |
| Path |
| Long-distance hiking trail | (depending on scale) | |
| Long-distance hiking trail | ||
| Pedestrians prohibited |