Deerfoot Trail SE in Calgary

Deerfoot Trail SE in Calgary is an asphalted, lit motorway (100 km/h). The road consists of two separate carriageways. It crosses a bridge. It runs in a south direction and continues into Deerfoot Trail NE, Bow Bottom Trail SE and Deerfoot Trail. It connects Cranston, Douglasdale/Douglas Glen, Maple Ridge, East Fairview Industrial, McKenzie Lake and Calgary. This road is part of the long-distance roads 2, CANAMEX Corridor (AB northbound) and CANAMEX Corridor (AB southbound).

Road Type
motorway
Speed Limit
100
Lanes
3
Route
north-south

Buildings nearby

Bonnybrook Wastewater Treatment Plant Centre
350 m
Bonnybrook Wastewater Treatment Plant Phosphorus Removal Building
450 m
Contractor Secondary D Construction Trailer
500 m
Bonnybrook Wastewater Treatment Plant Secondary Pumphouse #8
550 m
Bonnybrook Wastewater Treatment Plant Secondary Pumphouse #7
600 m
BonnyBrook Wastewater Treatment Plant Waste Gas Burner Building
600 m
Bonnybrook Wastewater Treatment Plant Digesters Pumphouse #3
650 m
Bonnybrook Wastewater Treatment Plant Digesters Pumphouse #2
700 m
BonnyBrook Wastewater Treatment Plant Digesters Pumphouse #1
700 m
Bonnybrook Wastewater Treatment Plant Primary Pumphouse #4
700 m
Bonnybrook Wastewater Treatment Plant Primary Pumphouse #3
750 m
B04B Electrical Switchgear 600V
750 m
Bonnybrook Wastewater Treatment Plant Primary Pumphouse #2
750 m
Bonnybrook Wastewater Treatment Plant Headworks Building
850 m

Commercial buildings nearby

Bonnybrook Wastewater Treatment Plant TEW Pump Station
350 m
Bonnybrook Wastewater Treatment Plant Control/Maintenance Shop
550 m

Garages nearby

Bonnybrook Wastewater Treatment Plant Garage
850 m

Industrial buildings nearby

Bonnybrook Wastewater Treatment Plant Ultraviolet Disinfection Building
250 m
Bonnybrook Wastewater Treatment Plant Power Generator & Heating Plant
550 m
BonnyBrook Wastewater Treatment Plant Dissolved Air Flotation Building
650 m
Bonnybrook Wastewater Treatment Plant Utility Building B
700 m
Bonnybrook Wastewater Treatment Plant Secondary C Fermenter Building
750 m
Brooks Transportation
950 m
Carvel Creative
1000 m

Parks nearby

Old Refinery Park
300 m

Railway lines nearby

CPKCR
600 m
Brooks Subdivision
650 m
CPKC
750 m
G.T.P. Line
800 m
Calgary Industrial Line
900 m

Railways under construction nearby

Green Line Phase 1 SE Segment
700 m

Service buildings nearby

BonnyBrook Wastewater Treatment Plant Modular Offices Trailer
650 m

Shelters nearby

Storage Structure South Tent
350 m
Storage Structure North Tent
400 m

Studios nearby

SlaughterHouse Studios
950 m